    年生产

Banja hydropower plant started commercial operations in Autumn 2016 as the first plant to be completed by Devoll 水电 Sh.A. (DHP), an 阿尔巴尼亚n-registered company, owned and operated by 十大最好的网赌平台.

Devoll 水电 builds, owns and operates hydropower plants in cascade along the Devoll River in southeast 阿尔巴尼亚, based on a concession agreement signed between 十大最好的网赌平台 and the Government of 阿尔巴尼亚.

Banja hydropower plant consists of an embankment dam with an impervious clay core approximately 80 metres high. The plant is equipped with two large Francis turbine units and one small Francis turbine unit and has an installed capacity of approximately 72 MW. The average annual production is approximately 255妇女和.

The plant utilises a head between 175 and 95 metres above sea level. At its highest regulated water level of 175 metres above sea level, the reservoir has a surface area of approximately 14 square kilometres and a storage capacity of 400 million cubic metres.

Banja hydropower plant is part of the Devoll 水电 Project which consists of development, 规划, construction and operation of the power plants Banja and Moglicë, with a total installed capacity of approximately 269 MW and a planned annual production of approximately 700 GWh.

The concession agreement also includes an option for a third hydropower plant, Kokel.

公司 所有权份额
十大最好的网赌平台 100%
  • Banja hydropower plant
    阿尔巴尼亚
    Artan Figu

    Banja hydropower plant

  • Banja hydropower plant
    阿尔巴尼亚
    爱德华·Pagrja

    Banja hydropower plant

  • The reservoir at Banja hydropower plant
    阿尔巴尼亚
    爱德华·Pagrja

    The reservoir at Banja hydropower plant

Find out more about our activities in 阿尔巴尼亚